RFP Closed

REQUEST FOR PROPOSAL – Eastern Africa Power System Modeling and Network Studies

Funding Agency: 
U.S. Agency for International Development
Implementing Agency: 
United States Energy Association
RFP Closing Date: 
April 2nd, 2019
Questions Due Date: 
March 19th, 2019

The United States Energy Association is inviting prospective organizations or individuals through this Request for Proposal (RFP) to submit proposals for providing training on the national load flow modeling, advanced contingency analyses and reactive power for Burundi’s utility REGIDESO, the Nile Equatorial Lakes Subsidiary Action Program (NELSAP) and the Eastern Africa Power Pool (EAPP); developing an accurate and validated operational model that reflects the current state of the Burundi power infrastructure; and performing detailed load flow and security analyses focusing on impediments to fully evacuating electricity produced by the generating stations associated with the Burundi Power network.

This is an activity implemented by USEA under the United States Agency for International Development (USAID) Power Africa Initiative.

As this is a USAID-funded program, the RFP follows USAID Procurement Regulations and Laws.  All bidder details will be kept confidential.

UPDATED! Questions and Responses to the RFP on Eastern Africa Power System Modeling and Network Studies - Final Update 

Horizontal Tabs