Based on the Scope of Work, the following deliverables and products shall be submitted:
Task 1:
Deliverable 1. Digital copies – in English and in Russian – of a presentation outlining project methodology and data questionnaires to be provided to Barqi Tojik for collecting all data necessary to develop a national dynamic model and planning models submitted to USEA at least 2 weeks prior to conducting the webinar.
Task 2:
Deliverable 2. Digital copies – in English and in Russian – of a draft training program 1 curriculum, and pre-training and post-training surveys submitted to USEA at least 2 weeks prior to conducting the training.
Deliverable 3. Conduct a 3-day training program (Training 1), including all necessary theoretical and practical elements, for up to 10 participants to prepare Barqi Tojik to develop/improve a national dynamic model using DIgSILENT PowerFactory software. Digital copies – in English and in Russian – of the full training curriculum, including manuals, presentations and all other training materials developed for Barqi Tojik and distributed to the participants.
Deliverable 4. Digital copies – in English – of a Training Report 1 on approach, accomplishments and recommendations.
Task 3:
Deliverable 5. A national dynamic model for the existing Barqi Tojik network topology. The model will be constructed to represent two characteristic regimes (peak and off-peak) and three hydrology scenarios for each regime (wet, average and dry hydrology).
Deliverable 6. Digital copy – in English – of a brief Model Creation Report, comprising the developed dynamic model overview and recommendations for future steps.
Task 4:
Deliverable 7. Digital copies – in English and in Russian – of a draft training program 2 curriculum, and pre-training and post-training surveys submitted to USEA at least 2 weeks prior to conducting the training.
Deliverable 8. Conduct the 2nd 3-day training program (Training 2), including all necessary theoretical and practical elements, for up to 10 participants to further enhance Barqi Tojik’s modeling and analytical capacity to perform advanced contingency analyses taking into account multi-level contingency analyses, tripping simulations and corrective actions; implement renewable generation and simulate their effects on the grid; perform Inertia/Governor load flow calculation; perform PV, QV analysis, and reactive power planning using DIgSILENT PowerFactory software. Digital copies – in English and in Russian – of the full training curriculum, including manuals, presentations and all other training materials developed for NETC and distributed to the participants.
Deliverable 9. Digital copies – in English – of a Training Report 2 on approach, accomplishments and recommendations.
Task 5:
Deliverable 10. Planning models – static and dynamic – for 5- and 10-years horizons to include planned renewable generation.
Deliverable 11. Digital copy - in English - of a brief Models Creation Report, comprising the developed planning models overview and recommendations for future steps.
Deliverable 12. Digital copy – in English – of a final report to include the following:
An overview of the consultancy (background and the Scope of Work);
Statement of consultant’s background and key qualifications;
Recommendations for improving operations of the utility based on the work performed during this consultancy;
Recommendations for further technical assistance.
Reporting: The consultant will report to USEA.
Schedule: The project is expected to begin in January 2021 - pending lifting of international travel restrictons due to COVID-19 - and take approximately 12 months to complete.
Task
|
Activities
|
Deliverables
|
Target Completion Date
|
Task 1
|
Conduct webinar on project methodology & questionnaires
|
Presentation on methodology
Data questionnaires
|
January 31, 2021
|
Task 2
|
Conduct 3-day training program
|
Curriculum
Pre- and post-training surveys
Training materials
Training report
|
April 30, 2021
|
Task 3
|
Develop national dynamic model
|
National dynamic model
|
May 31, 2021
|
Model Creation Report
|
June 30, 2021
|
Task 4
|
Conduct 2nd 3-day training program
|
Curriculum
Pre- and post-training surveys
Training materials
Training report
|
August 31, 2021
|
Task 5
|
Develop planning models
|
Planning models
|
October 31, 2021
|
Models Creation Report
|
November 30, 2021
|
Final report
|
December 31, 2021
|
These tentative assignment dates are provided solely for information purposes and the benefit of bidders. Modification of these assignment dates will not constitute a change in scope.