Error message

  • The specified file temporary://file7zdc6B could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileWCVhzF could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filefQWhUL could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filemyVNnC could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filePcFq7N could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file0BwVwm could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileF4NZvp could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileNCu5JJ could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filezYUJct could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileiZdVzE could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileK4tYdz could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file5sNRxR could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file6ulmMb could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filex65qCB could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filexQ9ArG could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Abstract

Coal-fired power plants are designed to run most efficiently and cost effectively when running at steady
baseload. Renewable energy systems, such as wind and solar, are much more sporadic in their energy
output, varying with weather conditions. The energy from renewable sources is currently prioritised for
input into the grid in many countries, meaning that thermal plants such as those powered by coal or nuclear
sources must now provide more flexible output to keep the available energy in the network at the required
level. This ramping and cycling of coal plants puts a strain on the boiler and increases the risk of operation
and maintenance problems. This report evaluates the different cost penalties of increasing the flexibility of
coal-fired plants to cope with the intermittency of renewable power source, indicating that cycling
operation can be expensive and, in some situations, costs can increase by orders of magnitude.