Deliverables: Based on the Scope of Work, the following deliverables and products shall be submitted:
Deliverable 1: Conduct a 3-day technical meeting presenting Senelec’s network model and improvements that could be made. Two digital copies (Word Document and PDF) – in English and in French – of a brief report on data collected, difficulties encountered in the process, a workplan for topics to cover during each training, and recommendations for mitigating these challenges.
Deliverable 2: Conduct a 5-day training program (Training 1), including all necessary theoretical and practical elements, to help Senelec improve its dynamic models for the existing network topology and develop specific user models to replicate the behavior of power plants and network equipment. Two digital copies – in English and in French – of the full workshop curriculum, including manuals, presentations and all other training materials developed for Senelec and distributed to the participants. The curriculum and other training materials shall be digitally sent to USEA at least 1 week prior to the training.
Deliverable 3: Two digital copies – in English and in French – of the 1st Training Report on approach, accomplishments and recommendations of the first 5-day training program. See “Reporting” section below for the requirements of the technical report.
Deliverable 4: Conduct a second 5-day training program (Training 2) to further enhance Senelec’s modeling and analytical capacity. Two digital copies – in English and in French – of the full workshop curriculum, including manuals, presentations and all other training materials developed for Senelec and distributed to the participants. The curriculum and other training materials shall be digitally sent to USEA at least 1 week prior to the training.
Deliverable 5: Two digital copies – in English and in French – of the 2nd Training Report on approach, accomplishments and recommendations. See “Reporting” section below for the requirements of the technical report.
Deliverable 6: Conduct a third 5-day training program (Training 3), including all necessary theoretical and practical elements, to further advance Senelec’s capacity. Two digital copies – in English and in French – of the full workshop curriculum, including manuals, presentations and all other training materials developed for Senelec and distributed to the participants. The curriculum and other training materials shall be digitally sent to USEA at least 1 week prior to the training.
Deliverable 7: Two digital copies – in English and in French – of the 3rd Training Report. The Report will include an Executive Summary, findings, recommendations, and annexes. See “Reporting” section below for the requirements of the technical report.
Reporting
The consultants will report to USEA. All communication and deliverables will be submitted to USEA for review.
The subcontractor shall submit a technical report to USEA at the end of each training (USEA will provide a template):
Technical Report to include:
- Executive Summary and overview of training;
- Statement of consultants’ background and key qualifications;
- Summary of knowledge/skills acquired by the participants;
- Summary of findings and models;
- Recommendations for improving operations;
- Recommendations for further technical assistance and training